The Construction Process
Following is an explanation of the swimming pool construction process. This is a basic
outline, as all jobs are different, and some require additional steps. This should help
clarify basic swimming pool construction.
Layout
The first step is to layout the pool in your backyard as we did on
your plans. This shows you where the pool location will be in relation to the rest of the
backyard.
Excavation
This is the big day that you have been waiting for. Pool excavation
requires heavy machinery including an excavator and dumptrucks. The backyard that you have
worked hard on becomes torn up in a matter of minutes, although we try our best to keep
the mess to a minimum. The form boards for the pool are set and the pool is excavated.
When the excavation is finished, the excavated hole resembles the same shape of the
finished product. |
 |
 |
Plumbing
A crew will dig trenches around the excavated pool and install the
circulation plumbing pipes between the pool and the filtration system. The plumbing is
pressure tested and inspected for leaks prior to backfilling the ditches. |
 |
 |
Reinforcing Steel Installation
A crew will install the reinforcing steel to the shape of your pool.
This steel reinforcing helps hold the gunite structure of the pool together. |
 |
 |
Gunite Application
Guniting a pool is one of the most impressive parts of the pool
construction process due to the equipment involved and the skilled craftsmen that shape
the pool. The gunite is pneumatically applied over the steel to form a single piece gunite
shell. The craftsmen will trim out the final shape of the pool. When the crew leaves, the
pool structure is in place and it becomes evident what the pool shape actually is. |
 |
Tile & Coping Installation
The tile and coping that surrounds the pool is then installed. This
begins to dress up the pool structure, giving your pool an attractive and safe pool per
meter. |
 |
 |
Equipment Installation
The pump and filter system is now installed and set into place.
Electrical
The electrical work of installing power to the pool filtration
equipment and to the underwater light is installed at this time.
Concrete Deck Installation
It is at this time that the deck is laid out, formed up, poured, and
finished. Control joints are also installed at this time. |
 |
 |
Preparation of Surface and Installing the Plaster
The surface is then cleaned and prepared for installation of the
waterproofing surface, which is usually plaster. The skilled craftsmen will trowel the
surface until it is smooth. The pool then begins filling.
 |
 |
Filtration Equipment Start-Up
When the pool is full, we start the filtration equipment and begin
analyzing the water and adding chemicals.
Clean Up and Grade Work
At this time, we remove construction debris from the site and bring
in a load of topsoil to spread around the pool area. It is at this time that you begin to
get your backyard back
Final List and Inspection
We then have a final list that we go through that includes such
things as installing the diving board, ladder, install the automatic cleaner, fill-in
expansion joint between the coping and the deck, as well as other things.
Explain System & Chemistry
It is at this time that we explain the complete operation of the
pool. We want you to have as much knowledge as possible, as we feel that the more you know
the happier that you will be with the swimming pool
|